Rickard Engineering was engaged as the GRP façade consultant for the West Gate Tunnel Project. Our scope included wind load assessment, concept design of the GRP façade system, support steelwork and connections, as well as ongoing design support throughout the detailed design stages. The project demonstrated the successful integration of engineering performance and architectural vision within one of Melbourne’s most significant infrastructure developments.