The Lanes Phase 2 is a residential development involving two towers on the waterfront of Mermaid Waters, Gold Coast. Rickard Engineering provided the engineering input, from concept and detailed design to certification, for the GRC podium panels and GRC fins up to the roof for this project. This is an appealing and complex project concerning all different 3D irregular curved shapes and, hence, variations in connections to cater to them. Transportation, lifting, and installation had their challenges because of the unique geometry and considerable panel size.